01-08-2018 by Sandra Karman

Traffic situation from July 23rd up to August 22nd

Reconstruction roundabout with bypasses and traffic flows. Cars follow blue arrows, cyclists in all directions. Crossing the road for cyclists takes place under direction of traffic controllers. Bypass routes are indicated. Rabbit Hill can be reached via traffic light control system from and towards the A1. Night closures in this phase from the 16thup until the 19thof July (4 nights) always from ca. 20.00hrs until 05.00hrs (roundabout is entirely closed).