{"id":3890,"date":"2018-08-01T11:28:02","date_gmt":"2018-08-01T10:28:02","guid":{"rendered":"https:\/\/www.ermeloyh.com\/?p=3890"},"modified":"2018-08-01T12:20:19","modified_gmt":"2018-08-01T11:20:19","slug":"traffic-situation-nationaal-hippisch-centrum","status":"publish","type":"post","link":"https:\/\/www.ermeloyh.com\/en\/traffic-situation-nationaal-hippisch-centrum\/","title":{"rendered":"Traffic situation National Equestrian Center"},"content":{"rendered":"
Traffic situation from July 23rd\u00a0<\/sup>up to August 22nd<\/sup><\/p>\n Reconstruction roundabout with bypasses and traffic flows.\u00a0Cars follow blue arrows, cyclists in all directions.\u00a0Crossing the road for cyclists takes place under direction of traffic controllers.\u00a0Bypass routes are indicated.\u00a0Rabbit Hill can be reached via traffic light control system from and towards the A1.\u00a0Night closures in this phase from the 16th<\/sup>up until the 19th<\/sup>of July (4 nights) always from ca. 20.00hrs until 05.00hrs (roundabout is entirely closed).<\/p>\n","protected":false},"excerpt":{"rendered":" Traffic situation from July 23rd\u00a0up to August 22nd Reconstruction roundabout with bypasses and traffic flows.\u00a0Cars follow blue arrows, cyclists in all directions.\u00a0Crossing the road for cyclists takes place under direction of traffic controllers.\u00a0Bypass routes are indicated.\u00a0Rabbit Hill can be reached via traffic light control system from and towards the A1.\u00a0Night closures in this phase from […]<\/p>\n","protected":false},"author":11,"featured_media":3887,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[36,20],"tags":[],"class_list":["post-3890","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-home-en","category-news"],"acf":[],"yoast_head":"\n